Business introduction
-
China Green Brand certificateSee more
-
Trademark authorization certificateSee more
-
企业信用等级证书See more
-
Enterprise credit registration certificateSee more
-
Integrity management model unit grade certificateSee more
-
Quality, service integrity unit certificateSee more
-
Metallurgical Avenue renovation projectSee more
-
Four Ring line ecological belt construction phase IISee more
-
Chemical industry zone road greening improvement projectSee more
-
Beihu sluice pump station and Beihu sluice Canal construction projectSee more
-
North Lake pumping station expansion and North Lake portSee more
-
Bajifu Street (Qinghua Road - Linjiang Avenue) renovation projectSee more
-
North lake Gate pump station introductionSee more
-
Park Closed Management (Phase I)See more
-
Beihuzha Pumping Station and Beihuzha Canal Construction Project (Chemical Industry Section)See more
-
Qingshan 2020 afforestation project on both sides of the Yangtze RiverSee more
-
Chemical industry zone road greening improvement projectThe project includes the renovation and upgrading of green belts on both sides of five roads: Wusha Road (Bajifu Street - Chemical Industry Road 2), Chemical Industry Road 2 (Green Avenue - Linjiang Avenue), Chemical Industry Road 3 (Waihuan South Road - Linjiang Avenue), Chemical Industry Road 5 (Jingang North Road - Linjiang Avenue) and Chemical Industry Road 6 (Huashan Avenue - Chemical Industry Avenue). The red line is 2-20 meters wide. The total green area is about 226,542 square meters, and 5,520 cubic meters of backfill earth. The construction contents are mainly greening works and earthmoving works.See more
-
EPC of Park emergency Management platform projectSee more
-
Huashan Avenue water supply network projectSee more
-
New materials Industrial ParkSee more
-
Wuhan Chemical Industry Zone industrial water supply phase II projectThe second phase of the industrial water supply project of Wuhan Chemical Industry Zone will build a DN1000 water supply pipe of 1947m, a DN600 water supply pipe of 1428m, a DN400 water supply pipe of 60m, a DN200 water supply pipe of 325m, as well as supporting valves, hydrants and other ancillary facilities. The project mainly guarantees the production and safety and reliability of enterprises in the park, makes up for the blind area of fire water supply of enterprises along the park, and forms a water supply ring network of industrial water supply pipelines in the park. Up to now, the project has been completed and accepted.See more
-
Industrial water supply inlet pipe emergency repairSee more
-
The high-tech security mechanism is in full and steady operationSee more
-
Domestic water supply inlet pipe emergency repairSee more
-
Industrial water supply inlet pressure gauge emergency repairSee more
-
Smart chemical park construction achievementsSee more
-
North Lake pumping station expansion and North Lake port reconstruction anSee more
-
North Lake two pumping station introductionThe second North Lake pumping station is located in Lianfeng Village, Bajifu Street, Qingshan District (Chemical Industry Park), Wuhan. The total cost of the project is 245 million yuan. The pumping station mainly focuses on the task of flood control and flood control, taking into account the comprehensive utilization of improving the water environment, so as to perfect the layout of Wuhan city flood control and flood drainage project and improve the flood control and flood drainage capacity of Wuhan city. The auxiliary buildings of the pumping station are mainly composed of Lianfeng gate, Yanxi Lake control gate, Beihu gate and Wuhui Gate self-discharging gate. The project won the "2020 Wuhan Municipal Engineering Gold Medal" award. The second North Lake pumping station is divided into four functional divisions: main and auxiliary plant area, power transformation area, office area and road square area. The design elevation of the road in the station area is 21.2m, the design elevation of the office building and substation is 21.5m, and the greening ground is 20.5m-21.2m. The drainage scale of Beihu No. 2 Pumping Station is 86 m³/s, and four mixed-flow pumps with a single pump of 21.5m³/s are set. Pump station hydraulic buildings mainly include: inlet canal, sewage barrier bridge, inlet pool, main pump room, outlet pipe, vacuum valve room, flood gate hydraulic room, outlet pool, outlet canal, pump station management room and other auxiliary supporting facilities.See more
Inquiry message
PURDUCTS
/
Business introduction