-
Wuhan Chemical Industry Zone industrial water supply phase II projectThe second phase of the industrial water supply project of Wuhan Chemical Industry Zone will build a DN1000 water supply pipe of 1947m, a DN600 water supply pipe of 1428m, a DN400 water supply pipe of 60m, a DN200 water supply pipe of 325m, as well as supporting valves, hydrants and other ancillary facilities. The project mainly guarantees the production and safety and reliability of enterprises in the park, makes up for the blind area of fire water supply of enterprises along the park, and forms a water supply ring network of industrial water supply pipelines in the park. Up to now, the project has been completed and accepted.See more
-
Industrial water supply inlet pipe emergency repairSee more
-
The high-tech security mechanism is in full and steady operationSee more
-
Domestic water supply inlet pipe emergency repairSee more
-
Industrial water supply inlet pressure gauge emergency repairSee more
-
Smart chemical park construction achievementsSee more
-
North Lake pumping station expansion and North Lake port reconstruction anSee more
-
North Lake two pumping station introductionThe second North Lake pumping station is located in Lianfeng Village, Bajifu Street, Qingshan District (Chemical Industry Park), Wuhan. The total cost of the project is 245 million yuan. The pumping station mainly focuses on the task of flood control and flood control, taking into account the comprehensive utilization of improving the water environment, so as to perfect the layout of Wuhan city flood control and flood drainage project and improve the flood control and flood drainage capacity of Wuhan city. The auxiliary buildings of the pumping station are mainly composed of Lianfeng gate, Yanxi Lake control gate, Beihu gate and Wuhui Gate self-discharging gate. The project won the "2020 Wuhan Municipal Engineering Gold Medal" award. The second North Lake pumping station is divided into four functional divisions: main and auxiliary plant area, power transformation area, office area and road square area. The design elevation of the road in the station area is 21.2m, the design elevation of the office building and substation is 21.5m, and the greening ground is 20.5m-21.2m. The drainage scale of Beihu No. 2 Pumping Station is 86 m³/s, and four mixed-flow pumps with a single pump of 21.5m³/s are set. Pump station hydraulic buildings mainly include: inlet canal, sewage barrier bridge, inlet pool, main pump room, outlet pipe, vacuum valve room, flood gate hydraulic room, outlet pool, outlet canal, pump station management room and other auxiliary supporting facilities.See more
Recruitment information
PURDUCTS
/
Recruitment information
-
2023-08-11
-
2023-08-09
-
2023-08-11
-
2023-08-11
-
2023-08-21
-
2023-08-29
-
2023-11-07
-
2023-10-26
共8条 每页20条 页次:1/1
- 1